| GRS.OFFSHORE RENEWABLES | |
| Stadthausbruecke 7, Hamburg, Deutschland, 20355, Germany | |
| Contact: | S&P Broker |
| View All GRS.OFFSHORE RENEWABLES Listings | |
| Status: | Available |
| Location: |
Hamburg Germany [View Map] |
| Reference: | #1144574 |
Delivery Date: July 2014
Classification Society: CCS
Navigation Area: Unlimited navigation area (tow-supported, not self-propelled)
Principal Dimensions Length Overall (LOA): 78.0 meters
Moulded Breadth: 36.0 meters
Moulded Depth: 6.0 meters (main deck to keel)
Structural Draft: 4.8 meters (operating load)
Gross Tonnage (GT): Approximately 8,500 tons (CCS registered)
Core Construction Parameters Pile Frame Height: 128 meters
Lifting Capacity: 450 tons (main hook of the pile frame)
Maximum Pile Diameter: 5.0 meters (steel pipe pile)
Maximum Pile Driving Length: 132 meters (one-time driving without segmentation)
Inclined Pile Construction: 0° ~ 18° (two-way adjustable)
Power System: 4 sets of main generators (CAT 3516 equivalent), total installed capacity: 7,200 kW
Positioning System: 8-point mooring positioning + dual RTK-GPS differential positioning (no DP system)
Construction Accuracy: Positioning error = 5 cm (centimeter-level precision)
Wind Resistance: Beaufort Scale 8 (stable berthing in sea state 5)
Core Construction Capabilities Hammer: Large-scale hydraulic impact hammer
Super-large Pile Construction:
One-time driving of 130-meter class extra-long steel pipe piles, no segmental construction required
Complex Geological Adaptation:
Adaptable to weathered rock, strongly weathered granite, and other complex strata
High-precision Control:
Centimeter-level positioning accuracy through dual GPS differential positioning and wave compensation
Notable Projects Peljesac Bridge Project (Croatia, 2018–2020):
Completed driving of extra-long steel pipe piles (130-meter class);
set a world record for one-time driving of super-long piles.
Domestic Offshore Wind Power Projects (Jiangsu, Shandong, etc.):
Completed driving of large-diameter piles for wind power bases;
daily construction efficiency up to 9 piles.
Cross-sea Bridge Projects (China):
Participated in pile foundation construction of multiple cross-sea bridges;
solved pile driving in deep water and complex strata.
LOA 78 m
Beam 36 m
Draft 4.8 m
Built in year 2014
Class : China Classification Society
Flag : China
Gross Tonnage of 8,500
8-Point installed
1 installed with a max lifting capacity of 450 tons
| Constructed: | 2014 |
| Length over all: | 78m |
| Beam: | 36m |
| Maximum draft: | 4.8m |
REGISTERED Achilles Member:
- UVDB Registered
- CONNEXIO Accredited
- SELLIHCA Qualified
MEMBER Renewable Energy Hamburg
MEMBER Bundesverband Windenergie
MEMBER Windenergie Agentur Bremerhaven
MEMBER Windenergy Network
GRS performs its services exclusively on the basis of its General Terms and Conditions, which are available at the GRS website www.grs-offshore.com.
All details are given in good faith but without guarantee. Subject to availability.
Note: Indicated location is approximate general area only.